Chargement de la calculatrice...
Calculation Basis
Assumptions & Limits
- The page appuis preliminaire checks but does not replace full code compliance revue.
- Allowable limits remain project-specific et must be checked separately.
- Module d'elasticite, inertia, et loading entrees must match the real member.
Reference Basis
- Documentation: Methodology
- Documentation: Engineering Review
- Roark's Formulas for Stress and Strain
- Mechanics of Materiaux references
- Specifique au projet standard reference
Combined Charge Setup
| Use case | Enter the governing combined design or service load |
| Typical use | Dead + imposed load combination review |
| Actuel calculatrice mode | Simply supported beam under UDL |
| Practical meaning | Combined line load already prepared upstream |
| Courant follow-up | Check result against L/250, L/300, or L/360 |
| Actuel preset | 7.2 m beam under 8.4 kN/m combined load |
Notes techniques
- This page does not try to act as a full code engine pour every Eurocode action rule. Its job is narrower et more practical: once the governing combination is known, it turns that charge into poutre response immediately.
- That makes it useful as a bridge page between upstream loading work et downstream serviceabilite checks on the actual poutre.
- If you are still selecting the right poutre size rather than checking one chosen member, pair this page avec the Eurocode 3 acier page or the Eurocode 5 bois page.
Pages associees